EnviroLogic Resources Home EnviroLogic Resources Home  
Home | ProgressReports | RI | WorkPlans | TechMemos | Links

PUBLIC PAGE

ASTORIA AREA-WIDE PETROLEUM SITE

Remedial Investigation, Feasibility Study, and Interim Remedial
Actions Information Pages

Astoria Image Welcome to the Public Page for the Astoria Area-Wide project. The files listed below will provide you with an update of the status of the project, technical data related to the project, and drawings showing the project site.

2007 Progress Reports

2007 February/March
2007 April/August

2006 Progress Reports

2005 December - 2006 January
2006 February
2006 March
2006 2nd Quarter

2006 August
2006 September
                            
2006 October
2006 November
2006 December                             

2005 Progress Reports

2005 January
2005 February
2005 March
2005 April
2005 May
2005 June - August
2005 September
2005 October
2005 November
                            
                            

2004 Progress Reports

2004 January
2004 February
2004 March
2004 April
2004 May
2004 June
2004 July
2004 August
2004 September
2004 October
2004 November
2004 December

2003 Progress Reports

2003 January
2003 February
2003 March
2003 April
2003 May
2003 June
2003 July
2003 August
2003 September
2003 October
2003 November
2003 December

Top | ProgressReports | RI | WorkPlans | TechMemos | Links

2002 Progress Reports

2002 January
2002 February
2002 March
2002 April
2002 May
2002 June
2002 June 18 Project Briefing
2002 July
2002 August
2002 September
2002 October
2002 November
2002 December

Top | ProgressReports | RI | WorkPlans | TechMemos | Links

Remedial Investigation Report and Related Documents

Final Remedial Investigation Report (June 17, 2008)
    Text (zip; 84 MB)
    Tables (zip; 896 KB)
    Sections 1-5 Figures (zip; 38 MB)
    Section 6 Figures (zip; 57 MB)
    Sections 7-12 Figures (zip; 5.1 MB)
    Appendix A (zip; 1.5 MB)
    Appendix B (zip; 32 MB)
    Appendix C (zip; 14 MB)
    Appendix D (zip; 2.9 MB)
    Appendix E (zip; 7.3 MB)
    Appendix F (zip; 2.4 MB)
    Appendix G (zip; 9.5 MB)
    Appendix H (zip; 5.7 MB)
    Appendix I (zip; 19 MB)
    Appendix J (zip; 182 KB)
    DEQ Transmittal Letter, June 17, 2008 (pdf; 932 KB)
    Response to DEQ Comments, June 17, 2008 (pdf; 12 MB)

Top | ProgressReports | RI | WorkPlans | TechMemos | Links

Work Plans

DEQ Approval, Work Plan for Monitoring Well Destruction and Reconstruction (February 16, 2006)
Work Plan for Monitoring Well Destruction and Reconstruction (February 2, 2006)

Human Health Risk Assessment Work Plan (October 10, 2005)
Ecological Risk Assessment Work Plan (September 22, 2005)

Former Mobil/Niemi Bulk Plant IRAM Work Plan (December 23, 2004)
Response to DEQ comments on the Vapor Inhalation Pathway Evaluation Work Plan (July 15, 2004)
Pipeline Investigation Work Plan (January 12, 2004)

Hydrocarbon Seep IRAM Specifications (December 22, 2003)
Vapor Inhalation Path Work Plan (December 12, 2003)
Phase 2 Soil Characterization Work Plan (July 28, 2003)
Phase 1 Ground Water Assessment Work Plan Addendum (July 2, 2003)
Storm Water Monitoring Work Plan (March 26, 2003)

RIFS and IRAM Development Proposal (January 21, 2002)
RIFS and IRAM Development Work Plan (July 15, 2002) (zip)

Top | ProgressReports | RI | WorkPlans | TechMemos | Links

Technical Memoranda

April 2007 Soil Removal Summary (March 27, 2009) (pdf)

Mobil-Niemi Oil Bulk Plant Contaminated Media Management Plan, Response to DEQ Comments (December 27, 2006) (pdf)
Mobil-Niemi Oil Bulk Plant Contaminated Media Management Plan (August 24, 2006) (pdf)
Preliminary ERA Results (May 15, 2006) (pdf)
Bioassay Reference Sample Selection (April 6, 2006) (pdf)
Sub-Slab Data Submittal (April 3, 2006) (pdf)

Upland Data Collection Technical Memorandum and Work Plan (August 19, 2005) (pdf)
Vapor Pathway Assessment Technical Memorandum (April 29, 2005) (pdf)
2004 Q 4 Storm Water Quarterly Monitoring Report (February 24, 2005) (pdf)

Hydrocarbon Seep IRAM As-Built Drawings (December 17, 2004) (pdf)
2004 Q 3 Ground Water Quarterly Monitoring Report (November 23, 2004) (pdf)
Technical Memorandum, Phase 2 Soil Characterization (October 27, 2004) (pdf; with cover letter)
Technical Memorandum, Level 1 Ecological Risk Assessment (August 12, 2004) (pdf)
Technical Memorandum, Historical Shell/Niemi/Mobil Petroleum Pipeline Investigation and Decommissioning (August 12, 2004) (pdf; w/figures)
2004 Q 2 Ground Water Quarterly Monitoring Report (August 12, 2004) (pdf)
Phase 1 Monitoring Well Installation Technical Memorandum (April 30, 2004) (pdf)
2004 Q 1 Ground Water Quarterly Monitoring Report (April 21, 2004) (pdf)
2003 Q 4 Storm Water Quarterly Monitoring Report (March 17, 2004) (pdf)
2003 Q 4 Ground Water Quarterly Monitoring Report (March 15, 2004) (zip)
2003 Q 3 Storm Water Quarterly Monitoring Report (January 28, 2004) (pdf)

Geophysical Investigation Technical Memorandum (November 25, 2003) (pdf)
Sediment Characterization Technical Memorandum (November 6, 2003) (zip)
Technical Memorandum, Beneficial Land and Water Use Surveys (February 25, 2003) (pdf)
Technical Memorandum, Phase 1 Source/Soil Characterization (January 30, 2003) and Appendices (Please contact us for a CD-ROM copy).

Top | ProgressReports | RI | WorkPlans | TechMemos | Links

Useful Links

Oregon Department of Environmental Quality Home Page
DEQ Astoria Area-Wide Page
Port of Astoria Home Page
The Daily Astorian

Top | ProgressReports | RI | WorkPlans | TechMemos | Links

Home ] Services ] Corporate Overview ] People ] Links & Downloads ]

Send mail to support with questions or comments about this web site.
Copyright 2000-2024 EnviroLogic Resources, Inc.

Tom Calabrese, RG, CWRE
Principal/Hydrogeologist
EnviroLogic Resources, Inc.
PO Box 80762
Portland, OR 97280-1762
(503) 768-5121
fax (503) 768-5122
tomcalabrese@h2ogeo.com
http://www.h2ogeo.com

Last modified: Mon Apr 13 04:06:02 UTC 2009